Skip to main content
Planning
Construction
Level crossing removed

The level crossing at Scoresby Road in Bayswater was removed in 2016 and the new Bayswater Station opened in 2017.

The level crossing was removed at the same time as the crossing at Mountain Highway. Both were removed by lowering the Belgrave/Lilydale rail line below Mountain Highway and Scoresby Road.

The new station precinct includes walking and cycling paths connecting Mountain Highway to Scoresby Road and linking in to the wider bike path network.

Public artwork has also been installed to enhance the newly created Mountain Highway underpass to Bayswater Station. The mural in the theme of 'Connecting to place, connecting people' was designed by Aboriginal artists, Graffix Creative, and students from Bayswater Secondary College.

On behalf of the Victorian Government, the Level Crossing Removal Project is overseeing the removal of 75 dangerous and congested level crossings across Melbourne by 2025.

News

Bayswater project creates positive environmental legacy

Bayswater project creates positive environmental legacy

07 Sep 2018
New stations star in sustainability

New stations star in sustainability

07 Mar 2018

Featured video

Image gallery

Publications

Bayswater Sustainability Report

01 Jul 2017

The Bayswater Level Crossing Removal Project was the first project completed under the Level Crossing Removal Program to be certified with a sustainability rating.

Bayswater community update - July 2016

01 Jul 2016

Construction is now well underway as part of the Bayswater Level Crossing Removal Project.

Map

Scoresby Road, Bayswater

Was this page helpful?
Send feedback

Contact Us

1800 105 105

Get in touch with us for any queries you have about our projects

24 hours, 7 days