Construction
Level crossing removed

The level crossing at Lochiel Avenue, Edithvale is being closed to traffic as part of the works to remove the Edithvale Road level crossing. Pedestrian and cycling access across the rail line will be retained with a signalised crossing for safety and accessibility.

While only a small number of vehicles use the Lochiel Avenue level crossing daily, it creates significant congestion with boom gates down for 39 minutes in the morning peak.

With the improved Edithvale Road intersection only 500 metres away, vehicles will have more efficient and safer access across the Frankston line.

Construction started this year and all the level crossings from Edithvale to Bonbeach will be gone in 2022.

For regular information about the project, sign up for email updates.

You can also text ‘ECB’ to 0429 839 892 to sign up to alerts for traffic and construction impacts for the Edithvale, Chelsea and Bonbeach level crossing removal projects.


Current works notices

Works notice – Lochiel Avenue, Edithvale level crossing closure

Works notice – Bonbeach piling works, November

Works notice – Chelsea piling works, November

Works notice – Edithvale piling works, November

Works notice – Fraser Avenue drainage upgrade

Current disruptions

16 Apr 2020 1586959200 1633096740 to Oct 2021

Station Street, Edithvale, Chelsea and Bonbeach – lane, car park and footpath closures

Road; Pedestrian

Icon/Road/Rev Road

Icon/Ped/Rev Created with Sketch. Pedestrian

FRANKSTON LINE

There may be short periods of lane, car park or footpath closures at some locations along Station Street throughout Aspendale, Edithvale, Chelsea and Bonbeach to enable works to be carried out safely, from Wednesday 16 April 2020 to late 2021.

Aug 2020 1596204000 1638363540 to Dec 2021

Edithvale, Chelsea and Bonbeach – impacts to pedestrian crossings

Pedestrian

Icon/Ped/Rev Created with Sketch. Pedestrian

FRANKSTON LINE

There will be impacts to pedestrian crossings in Edithvale, Chelsea and Bonbeach from August 2020 to late 2021.

04 Sep 2020 1599141600 1641041940 to Jan 2022

Bus routes 706 and 902 – stop closures

Bus

Icon/Bus/rev Bus

FRANKSTON LINE

Bus Routes 706 (to Mordialloc) and 902 (to Airport West) will not service selected bus stops from Friday 4 September 2020 to early 2022.

05 Sep 2020 1599228000 1641041940 to Jan 2022

Station Street, Edithvale to Bonbeach – lane closures and reduced on-street parking

Road; Cycling

Icon/Road/Rev Road

FRANKSTON LINE

There will be on-going sections of lane closures and reduced speed limits along Station Street between Edithvale and Bonbeach from Saturday 5 September 2020.

Oct 2020 1601474400 1604235540 to Nov 2020

Edithvale – various road closures, car parking and access changes

Road; Pedestrian; Cycling

Icon/Road/Rev Road

Icon/Ped/Rev Created with Sketch. Pedestrian

FRANKSTON LINE

There will be various road closures, car parking and access changes at times on Denman Avenue, The Esplanade, Bapaume Avenue, Station Street, Edithvale Road, Bank Road, Fraser Avenue and Correa Street Edithvale in October and November.

05 Oct 2020 1601816400 1638363540 to Dec 2021

Nepean Highway and Station Street, Aspendale to Bonbeach – lane closures

Road; Cycling

Icon/Road/Rev Road

FRANKSTON LINE

Nepean Highway will be reduced to two northbound lanes and one southbound lane between Birdwood Street, Aspendale and the Patterson River bridge, Bonbeach from Monday 5 October 2020 to late 2021. The bike lane on Station Street will also be temporarily closed during this time.

05 Oct 2020 1601816400 1635685140 to Oct 2021

Bonbeach – various lane closures, car parking and travel changes

Road; Pedestrian; Cycling

Icon/Road/Rev Road

Icon/Ped/Rev Created with Sketch. Pedestrian

FRANKSTON LINE

There will be various lane closures, car parking and access changes on Nepean Highway, Station Street, Monica Avenue and York Street, Bonbeach from Monday 5 October 2020 to late 2021.

19 Nov 2020 1605704400 1606481940 to 27 Nov 2020

Argyle Avenue, Chelsea – level crossing closure

Road; Cycling

Icon/Road/Rev Road

FRANKSTON LINE

The Argyle Avenue level crossing in Chelsea will be closed to vehicles from 7am Thursday 19 November to 9am Friday 27 November.

20 Nov 2020 1605790800 1612184340 to Feb 2021

Fraser Avenue, Edithvale – changed vehicle access

Road; Cycling

Icon/Road/Rev Road

FRANKSTON LINE

There will be ongoing changes to vehicle access along Fraser Avenue between Station Street and French Avenue between Friday 20 November 2020 and early February 2021, including frequent closures at Station Street.

30 Nov 2020 1606680000 1606978800 to 03 Dec 2020

Lochiel Avenue, Edithvale – level crossing closure

Road

Icon/Road/Rev Road

FRANKSTON LINE

The level crossing at Lochiel Avenue, Edithvale will be closed to vehicles from 7am Monday 30 November to 6pm Thursday 3 December.

News

Working together to save native plants along the Frankston line

Working together to save native plants along the Frankston line

26 Nov 2020
Working around the clock in Edithvale, Chelsea and Bonbeach

Working around the clock in Edithvale, Chelsea and Bonbeach

10 Sep 2020

Featured video

Image gallery

Publications

Works notice – Lochiel Avenue, Edithvale level crossing closure

19 Nov 2020

To prepare for level crossing removal works in Edithvale, Chelsea and Bonbeach, utility services such as electricity, water, gas and telecommunications are being upgraded and relocated.

Works notice – Edithvale Road level crossing closure

04 Nov 2020

To prepare for level crossing removal works in Edithvale, Chelsea and Bonbeach, utility services such as electricity, water, sewerage, gas and telecommunications are being upgraded and relocated