Three crossings at Fitzgerald Road in Ardeer, and Robinsons Road and Mt Derrimut Road in Deer Park will be removed along the Geelong and Ballarat lines.

A road bridge is the confirmed design for removing the Fitzgerald Road level crossing in Ardeer. The project has been fast tracked for completion by 2023.

The boom gates in Deer Park and Ardeer can be down for up to 45 per cent of the morning peak, when up to 37 trains run through the crossings. Current network plans involve increasing trains running on the Geelong and Ballarat lines, meaning more boom gate downtime.

Community feedback will be used to help refine selected parts of the Fitzgerald Road design, such as landscaping, walking and cycling connections and finishes to be used on the road bridge.

For regular information about the progress of this project, sign up for email updates.

On behalf of the Victorian Government, the Level Crossing Removal Project is removing 75 dangerous and congested level crossings across Melbourne by 2025.

News

Two level crossing removals fast tracked in the west

Two level crossing removals fast tracked in the west

11 Jul 2020
More level crossing removals on the way

More level crossing removals on the way

30 Nov 2018

Featured video

Image gallery

Publications

Fitzgerald Road – Design options fact sheet

13 Oct 2020

Summary of the design options considered for the Fitzgerald Road level crossing removal project.

Fitzgerald Road, Ardeer community update – July 2020

14 Jul 2020

The Victorian Government has fast tracked the removal of the dangerous and congested level crossing at Fitzgerald Road, Ardeer.