Skip to main content
Planning
Construction
Level crossing removed

Works to remove the Argyle Avenue level crossing will start in 2020.

The level crossing will be removed by lowering the rail line into a trench and building a new road at the current level.

Thames Promenade will also be extended to the Nepean Highway. The Swanpool Avenue and Chelsea Road level crossings will be closed to vehicles.

The new road connection between Thames Promenade and the Nepean Highway will create a direct connection to major arterial roads, including the Mornington Peninsula Freeway and future Mordialloc Freeway.

A new Chelsea Station, with improved pedestrian and bus connections, will be built as part of the project.

The boom gates at the three Chelsea level crossings can be down for up to 40 per cent of the morning peak, when up to 30 trains run through the crossings. Current network plans to increase the number of trains running on the Frankston line, means more boom gate downtime.

Construction starts this year and all the level crossings from Edithvale to Bonbeach will be gone in 2022.

Visit our online engagement hub to give feedback or view past consultation.

For regular information about the progress of this project, sign up for email updates.

On behalf of the Victorian Government, the Level Crossing Removal Project is overseeing the removal of 75 dangerous and congested level crossings across Melbourne by 2025.

Current disruptions

16 Apr 2020 1586959200 1601560740 to Oct 2020

Station Street, Edithvale, Chelsea and Bonbeach – lane, car park and footpath closures

Road; Pedestrian

Icon/Road/Rev Road

Icon/Ped/Rev Created with Sketch. Pedestrian

FRANKSTON LINE

From Wednesday 16 April to October 2020, there may be short periods of lane, carpark or footpath closures at some locations along Station Street through Aspendale, Edithvale, Chelsea and Bonbeach.

12 Jul 2020 1594476000 1641041940 to Jan 2022

Chelsea Station – car park closure

Road

Icon/Road/Rev Road

FRANKSTON LINE

The Chelsea Station car park will close from Sunday 12 July 2020 to early 2022.

24 Jul 2020 1595512800 1597499940 to Aug 2020

Chelsea Station – Parkiteer closure

Cycling

FRANKSTON LINE

The Parkiteer bicycle cage at Chelsea Station will temporarily close from Friday 24 July to mid August, as part of level crossing removal works at Chelsea.

24 Jul 2020 1595512800 1601128740 to 26 Sep 2020

Nepean Highway, Chelsea – lane closure

Road; Cycling

Icon/Road/Rev Road

FRANKSTON LINE

The southbound slow lane on Nepean Highway, Chelsea will be closed between Foy Avenue and Barnes Grove from 7am Friday 24 July to 7am Saturday 26 September.

31 Jul 2020 1596117600 1597499940 to 15 Aug 2020

Swanpool Avenue, Chelsea – level crossing closure

Road; Pedestrian; Cycling

Icon/Road/Rev Road

Icon/Ped/Rev Created with Sketch. Pedestrian

FRANKSTON LINE

The Swanpool Avenue level crossing in Chelsea will be closed to pedestrians on Friday 31 July, and closed to both pedestrians and vehicles from 7am Saturday 1 August to 3pm Saturday 15 August.

11 Aug 2020 1597068000 1597759140 to 18 Aug 2020

Barnes Grove, Swansea Road, Shenfield Avenue and Golden Avenue, Chelsea – vehicle access restrictions

Road

Icon/Road/Rev Road

FRANKSTON LINE

Vehicle movements will be restricted on Barnes Grove, Swansea Road, Shenfield Avenue and Golden Avenue in Chelsea at times from 7am Tuesday 11 August to 6pm Tuesday 18 August.

13 Aug 2020 1597316400 1597600800 to 17 Aug 2020

Frankston Station - temporary car park closures

Road

Icon/Road/Rev Road

FRANKSTON LINE

There will be some car space closures at Frankston Station due to replacement bus operations for commuters from Friday 13 August to Monday 17 August.

13 Aug 2020 1597316400 1598882340 to 31 Aug 2020

Mordialloc Station - temporary car park closures

Road

Icon/Road/Rev Road

There will be temporary car space closures at Mordialloc Station from Thursday 13 August to Monday 31 August.

14 Aug 2020 1597327200 1597586340 to 16 Aug 2020

Frankston line – buses replace trains

Train

image/svg+xml Rail

FRANKSTON LINE

Buses will replace trains on the Frankston line between Mordialloc and Frankston stations from 9.20pm Friday 14 August to last service Sunday 16 August.

01 Sep 2020 1598958000 1599400740 to 06 Sep 2020

Frankston and Stony Point lines – buses replace trains

Train

image/svg+xml Rail

FRANKSTON LINE

Buses replace trains between Mordialloc and Frankston from 9pm Tuesday 1 September to the last service Sunday 6 September.

News

50 level crossings under contract

50 level crossings under contract

11 Dec 2019
Station designs announced for Edithvale, Chelsea and Bonbeach

Station designs announced for Edithvale, Chelsea and Bonbeach

09 Dec 2019

Featured video

Image gallery

Publications

Works notice – Edithvale, Chelsea and Bonbeach night works

10 Aug 2020

To allow works to be carried out safely there will be a rail closure between 10pm Friday 14 August and 3am Monday 17 August 2020. Works will take place 24/7.

Works notice – Chelsea sewer relocation

10 Aug 2020

To prepare for level crossing removal works in Edithvale, Chelsea and Bonbeach utility services, such as electricity, water, gas and telecommunications are being upgraded and relocated on Station St

Map

Argyle Avenue, Chelsea