North McKinnon Centre 2016 flooding in Ormond and McKinnon report

01 Sep 2017

Throughout 2017 Melbourne Water and the Level Crossing Removal Authority have undertaken a joint review of flooding that occurred as a result of intense rainfall on 29 December 2016 and how the drainage system installed as part of the North McKinnon Centre Level Crossing Removal Project operated during the storm event. The outcomes of the review are available in this document.

If you require assistance in accessing or understanding this report, please contact us via email or call 1800 105 105.