Skip to main content

Disruptions

Read the EES

19 Mar 2018

We aim to make sure that all content on the Level Crossing Removal Authority website can be accessed by the widest possible audience.

If you have issues or suggestions on how we can improve the accessibility of this website, please contact us via email call 1800 105 105 or visit our accessibility page.

TitlePDFWord
Preliminary content Download PDF, 1.5 MBDownload DOCX, 2.4 MB
Chapter 1 – Introduction Download PDF, 2.8 MBDownload DOCX, 10.4 MB
Chapter 2 – Rationale and project descriptions Download PDF, 2.2 MBDownload DOCX, 4.8 MB
Chapter 3 – Key Findings Download PDF, 2.7 MBDownload DOCX, 5.0 MB
Chapter 4 – Assessment Framework Download PDF, 718.2 KBDownload DOCX, 3.7 MB
Chapter 5 – Modelling the water environment Download PDF, 6.3 MBDownload DOCX, 15.4 MB
Chapter 6 – Edithvale-Seaford Wetlands and groundwater dependent ecosystems Download PDF, 6.0 MBDownload DOCX, 10.5 MB
Chapter 7 – Acid sulfate soils and contamination Download PDF, 6.1 MBDownload DOCX, 10.8 MB
Chapter 8 – Potential local impacts at Edithvale and Bonbeach Download PDF, 3.8 MBDownload DOCX, 11.9 MB
Chapter 9 – Environmental Management Framework Download PDF, 1.5 MBDownload DOCX, 3.7 MB
Chapter 10 – Sustainability and climate change Download PDF, 476.2 KBDownload DOCX, 1.5 MB
Chapter 11 – Urban design approach Download PDF, 1.3 MBDownload DOCX, 4.1 MB
Chapter 12 – Community and stakeholder engagement Download PDF, 1.7 MBDownload DOCX, 5.0 MB

Attachments

I – Legislation and Policy Report PDF, 709.2 KB

II – Environmental Risk Report PDF, 6.6 MB

III – Matters of National Environmental Significance PDF, 3.8 MB

IV – LXRA Corporate Policies PDF, 4.2 MB

V – Draft Planning Scheme Amendments PDF, 6.8 MB

VI – Map Book PDF, 40.7 MB

VII – Draft Urban Design Guidelines Edithvale PDF, 13.6 MB

VIII – Draft Urban Design Guidelines Bonbeach PDF, 16.7 MB

Technical reports

Technical Report A – Groundwater PDF, 29.8 MB

Technical Report A – Groundwater – Appendix B PDF, 3.7 MB

Technical Report A – Groundwater – Appendix C PDF, 8.8 MB

Technical Report A – Groundwater – Appendix D (part 1 of 3) PDF, 47.7 MB

Technical Report A – Groundwater – Appendix D (part 2 of 3) PDF, 33.2 MB

Technical Report A – Groundwater – Appendix D (part 3 of 3) PDF, 36.9 MB

Technical Report B – Ecology: Wetlands and Groundwater Dependent Ecosystems PDF, 18.9 MB

Technical Report C – Acid Sulfate Soils and Contamination PDF, 19.7 MB

Technical Report C – Acid Sulfate Soils and Contamination – Appendix D PDF, 706.5 KB

Technical Report C – Acid Sulfate Soils and Contamination – Appendix E (part 1 of 4) PDF, 35.3 MB

Technical Report C – Acid Sulfate Soils and Contamination – Appendix E (part 2 of 4) PDF, 39.2 MB

Technical Report C – Acid Sulfate Soils and Contamination – Appendix E (part 3 of 4) PDF, 43.5 MB

Technical Report C – Acid Sulfate Soils and Contamination – Appendix E (part 4 of 4) PDF, 27.7 MB

Technical Report C – Acid Sulfate Soils and Contamination – Appendix I PDF, 28.8 MB

Technical Report D – Ecology: Project Areas PDF, 3.1 MB

Technical Report E – Surface Water PDF, 988.7 KB

Technical Report F – Land Use PDF, 2.3 MB

Technical Report G – Traffic PDF, 4.0 MB

Technical Report H – Noise and Vibration PDF, 4.2 MB

Technical Report I – Air Quality PDF, 1.3 MB

Technical Report J – Landscape and Visual PDF, 7.8 MB

Technical Report K – Business PDF, 1.2 MB

Technical Report L – Social PDF, 1.7 MB

Technical Report M – Aboriginal Cultural Heritage PDF, 4.9 MB

Technical Report N – Historic Heritage PDF, 6.2 MB

Was this page helpful?
Send feedback

SMS updates

Receive SMS on the progress of the Level Crossing Removal Project

Sign up for SMS updates

Updates

Stay up to date with the progress of the Level Crossing Removal Project

Sign up for updates

Contact Us

1800 105 105

Get in touch with us for any queries you have about our projects

24 hours, 7 days