Caulfield to Dandenong - Area 3 update: May 2018

29 May 2018

We have removed the level crossings at Corrigan, Heatherton and Chandler roads. Noble Park Station is now operational as works continue around the brand new station precinct.

New elevated station along Caulfield to Dandenong line

What we’ve been doing

Now that the level crossings have been removed in Noble Park we have shifted our focus on new parkland in the area. We recently brought in new top soil to prepare for tree planting and have removed the old tracks at Corrigan Road. We are also continuing work on the new Noble Park Station with construction of the ground level buildings. These include a staff area and PSO facilities. In another big change for the area, the old Noble Park Station was demolished last month. This space will soon be cleared for further construction of the new open space.

What’s coming up

In the coming weeks we will remove the old tracks at Heatherton and Chandler Roads. The ground level buildings at the new station will also continue construction. We will start the greening of the old rail corridor with preparations getting underway for the planting of the first new trees in the open space. More sections of the shared use path will also be concreted. When completed, this new path will connect Noble Park to the Eastlink trail.

Upcoming disruptions

Road

Chandler Road, Noble Park Chandler Road, Noble Park will close at the train line from Tuesday 15 May to Friday 25 May 2018 for track removal and road resurfacing. Pedestrian access may be impacted during this time. Minor delays can be expected. Please detour via Heatherton Road, Douglas Street or Yarraman Road. All dates and times are subject to change.

Rail

Buses will replace trains:

  • From 8:00pm Monday 21 May until last service Wednesday 23 May between Caulfield and Westall
  • From 12:30am Saturday 26 May until last service Sunday 27 May between Caulfield and Dandenong
  • From 8:00pm Tuesday 29 May to 8:00pm Friday 1 June between Caulfield and Westall
  • From 8:00pm Friday 1 to Saturday 2 June between Flinders Street, Westall and Moorabbin (Frankston Line)
  • From Sunday 3 to last service Friday 8 June between Caulfield and Westall
  • From Saturday 9 to last service Monday 11 June between Flinders Street, Westall and Moorabbin (Frankston Line)
  • From Tuesday 12 to last service Sunday 17 June between Caulfield and Westall

Project timeline

DateProgress
October 2016
  • Foundation works to strengthen the ground commenced
December 2016
  • Noble Park Station design released
February 2017
  • First piers installed
April 2017
  • First beams installed
June 2017
  • Foundation works completed
July 2017
  • Beams installed over Corrigan Road
  • Installation of parapets commenced
September 2017
  • All piers installed
  • Construction on Noble Park Station platform commenced
  • Beams installed over Heatherton and Chandler Roads
October 2017
  • 100% of beams installed
  • Bridge deck over Mile Creek rebuilt
  • Installation of Noble Park platform completed
November – December 2017
  • Embankment construction commenced
  • Laying of elevated rail commenced
February 2018
  • Commence installation of rail signalling
  • Noble Park Station operational
  • Level crossings removed at Corrigan, Heatherton and Chandler roads
  • Track and signalling complete
Mid – late 2018
  • Noble Park Station complete
  • Open space landscaping complete
  • Bicycle and pedestrian path complete

View this in PDF format PDF, 357.5 KB